Collision
Pons does not check names or symbols. The studio queries the live API and counts exact matches.
Check the name, the logo and the tax before you sign. Pons freezes your token’s metadata in the contract at launch. There is no fix afterwards.
Free. No wallet. Live Pons data, in your browser.
1,924
launches in one week reused a symbol. 13 to 20 Nov 2026, Pons.
Enter what you plan to freeze. The studio checks it against live Pons data and tells you what to fix before you sign.
Five checks: name, symbol, logo hosting, logo image, tax. Each one says exactly what to fix.
Read it once more. Every field above is frozen at launch and cannot be changed, by anyone.
0 of 8 done.
In November 2026 we launched a token on pump.fun with an image link that later expired. The metadata was frozen at launch, so the link could not be changed, and the token’s image died with it. Launch Cube exists so nobody signs a launch with an expiring image again.
1,924
launches in one week reused a symbol (13 to 20 Nov 2026)
10%
maximum creator tax on Pons, set by the factory
3
seconds of snipe tax after launch, starting at 99%
Pons freezes the same fields on-chain: name, symbol, logo, description, tax. The lesson applies here too.
Four steps between an idea and a launch you do not regret.
Pons does not check names or symbols. The studio queries the live API and counts exact matches.
The logo URL freezes on-chain. The studio probes the host and the image before you sign.
The creator tax freezes too, capped at 10%. The simulator shows the fee math before you choose.
The first seconds carry a 99% tax. The studio reads the live window from the factory, and reminds you the exempt list is set at launch.
The checks are public by design: every rule is visible in the page source.
Every check runs on your device. Your inputs go only to the Pons API and the hosts you ask the studio to probe.
The snipe window, the tax cap and the launch fee are read live from the factory contract.
No wallet. No sign-up. No server keeps your inputs.
The frozen-metadata gate is documented with the project: the contract has no setter, no owner, and no upgrade path.